In 3PL warehousing, daily operations usually include receiving, storage, inventory management, and order fulfillment. However, customers may also require special warehouse operations within a short timeframe.
Examples include:
Although product labeling may seem like a simple task, handling tens of thousands of units across multiple SKUs requires much more than simply adding more workers.
The warehouse needs to solve several challenges at the same time:
Recently, Dragon3PL completed a real product relabeling project.
The project involved:
Through detailed preparation, on-site management, and quality control procedures, the project was completed according to plan.
| Project | Details |
|---|---|
| Project Type | Product Relabeling |
| Completion Time | 3 days |
| Total Quantity | 56,000 units |
| SKU Volume | 44 SKUs |
| Staffing | 15 operators on Day 1, 10 operators on Days 2-3 |
| Project Characteristics | Large volume, multiple SKUs, short operation timeline |
| Quality Control | Process inspection + final sampling inspection |
For large-scale warehouse relabeling projects, preparation before starting the operation directly impacts the overall efficiency.
Without proper planning, common problems may occur:
Therefore, sufficient preparation was completed before the project started.
This project involved 44 SKUs.
If labels for different products are mixed together, operators need additional time to identify and confirm each label, increasing the risk of:
Before operation started, all labels were sorted and organized according to SKU.
For example:
Each SKU had its designated label area.
This allowed operators to quickly access the correct labels during the process and reduced potential errors.
For multi-SKU warehouse operations, effective label management is the first step toward accuracy.
Besides preparing labels, the products themselves also needed to be organized in advance.
For example:
If one SKU contained 10 cartons of products, those cartons were grouped together and matched with the corresponding labels.
After preparation, the operation could follow a clear workflow:
Pick products → Apply labels → Complete process → Move to next batch
This reduced unnecessary searching and helped maintain a stable workflow.
Clear product classification is an important foundation for efficient warehouse operations.
Before the operation team arrived, warehouse management prepared the working areas in advance.
Preparation included:
For example:
If 15 operators were scheduled for the first day, enough workstations needed to be prepared beforehand.
This allowed the team to start immediately instead of spending time waiting for setup.
For short-term warehouse projects, reducing idle time directly improves productivity.
Because this project required quick organization of operation resources, a pre-operation briefing was conducted before starting.
The training included two key areas:
Including:
Including:
A consistent operating standard helped the team quickly adapt to the project requirements.
After preparation was completed, on-site management became the key factor in maintaining project progress.
During the operation, not every team member performed the same tasks.
Different operators had different strengths:
Some were faster at:
Some were faster at:
Some were more detail-oriented at:
Therefore, task allocation was adjusted based on actual performance.
For example:
By matching people with suitable tasks, the overall workflow remained continuous.
Warehouse efficiency is not only about adding more workers — it is also about optimizing people and processes.

The staffing level was not the same throughout the three-day project.
On the first day, 15 operators were assigned because the team needed to establish the workflow and handle the initial workload.
As the project entered a more stable stage, staffing was adjusted to 10 operators for the following two days based on the remaining workload.
This approach helped:
In warehouse operations, staffing needs to remain flexible according to project progress.

During the operation, warehouse supervisors continuously monitored progress.
When one SKU was close to completion, the team prepared in advance:
Waiting until the current batch was completely finished before preparing the next task could create unnecessary downtime.
Effective warehouse management requires:
Current task in progress, next task already prepared.
This helps reduce interruptions and maintain workflow continuity.
In large-scale warehouse operations, workforce scheduling affects not only speed but also continuity.
If multiple operators leave their stations at the same time:
Therefore, break schedules and temporary departures need to be managed properly to keep operations running smoothly.
Quality control should not only happen at the end.
During the labeling process, supervisors continuously checked:
Identifying problems early helps reduce rework later.


Completing the labeling process does not mean the warehouse operation is finished.
Final quality confirmation is still required.
The team first confirmed:
For example:
If one SKU contained 10 cartons, the team confirmed that all 10 cartons had completed the labeling process and were properly recorded.
Warehouse fulfillment requires both speed and accuracy.
After completing the operation, quality inspections were performed.
Inspection methods included:
The inspection covered:

For example:
Several cartons were randomly opened to verify that internal product labels matched the external packaging information.
Through sampling inspection, the team could confirm that the completed batch met quality requirements.

After inspection was completed, products were repacked and sealed to ensure they were ready for the next warehouse or transportation process.
Final repacking ensured:

| Objective | Result |
|---|---|
| Completion Time | Completed within 3 days |
| Product Volume | 56,000 units |
| SKU Management | 44 SKUs processed separately |
| Workforce Management | Staffing adjusted according to project stage |
| Operation Method | Label classification, product organization, workflow coordination |
| Quality Control | Process inspection + final sampling inspection |
Completing 56,000 product relabeling tasks within 3 days may appear to be a repetitive warehouse activity, but the real challenge lies in the operational planning behind it.
From:
every step affects the final delivery result.
For 3PL warehousing operations, handling urgent, large-volume, multi-SKU projects is not simply about adding more workers.
The key is building a clear and executable warehouse operation process through proper planning, coordination, and quality control.
This is also an important capability for professional 3PL warehouses when supporting special projects and customized customer requirements.
Ya sea que esté preparando su primer envío o buscando un socio logístico más confiable, estamos aquí para ayudarle.
Cuéntenos sus necesidades de abastecimiento o envío y nuestro equipo le responderá con recomendaciones prácticas.
Ofrecemos almacenamiento, consolidación de mercancías, envíos FCL, entrega puerta a puerta y numerosos servicios de valor añadido para empresas que envían productos desde China hacia mercados internacionales.
WhatsApp us